Smoltek Hydrogen and Heraeus Precious Metals advance next-generation ultra-low iridium electrolysis technology
Advertisement
Smoltek Nanotech Holding AB announces that its subsidiary Smoltek Hydrogen and Heraeus Precious Metals advance their strategic collaboration to develop next-generation, ultra-low iridium Porous Transport electrodes (PTEs) for Proton Exchange Membrane (PEM) water electrolysis. As a major milestone in this partnership, the companies will initiate a rigorous 3,000-hour long-term durability test this autumn.
Symbolic imageThe combination of Smoltek’s proprietary nanotechnology and Heraeus Precious Metals low-loading iridium catalysts lead to significant lower iridium consumption at high catalytic activity and conductivity.
Smoltek, AI generated illustration
The testing campaign will specifically evaluate the long-term operational stability of Smoltek’s proprietary nanostructured iridium catalyst layer, marking a critical step toward the commercialization and large-scale industrialization of cost-effective green hydrogen production.
The collaboration leverages Smoltek’s innovative nanotechnology alongside Heraeus Precious Metals’ world-class expertise in precious metal electrocatalysts and material analysis.
“Our nanostructured layer offers a unique capability to maximize charge and mass transport properties within a thickness of just a few microns. By optimizing this specific catalyst architecture, we can simultaneously maintain high electrolyzer efficiency while successfully reducing the amount of iridium needed to below 0.1 mg/cm² loading,” says Fabian Wenger, Head of R&D at Smoltek Hydrogen.
Testing and validation are central to transitioning this breakthrough from the laboratory to industrial application. Heraeus Precious Metals will lead the upcoming testing phase, bringing extensive resources to evaluate the catalyst's performance under realistic operational conditions.
“We are looking forward to commencing this extensive testing campaign and to provide the critical material analysis required to validate this technology. With our capabilities we will continue to support all steps towards an industrialization of these highly promising ultra-low iridium PTEs with our comprehensive analytical and testing capabilities” says Christian Gebauer, Head of Innovation at the Hydrogen Systems Division of Heraeus Precious Metals.
This joint effort directly addresses one of the primary bottlenecks in scaling PEM electrolysis: the high cost of iridium. By drastically reducing the required loading without sacrificing durability, Smoltek Hydrogen and Heraeus Precious Metals are paving the way for the sustainable expansion of the global green hydrogen infrastructure.
Topics
Organizations
Other news from the department business & finance
Get the chemical industry in your inbox
By submitting this form you agree that LUMITOS AG will send you the newsletter(s) selected above by email. Your data will not be passed on to third parties. Your data will be stored and processed in accordance with our data protection regulations. LUMITOS may contact you by email for the purpose of advertising or market and opinion surveys. You can revoke your consent at any time without giving reasons to LUMITOS AG, Ernst-Augustin-Str. 2, 12489 Berlin, Germany or by e-mail at revoke@lumitos.com with effect for the future. In addition, each email contains a link to unsubscribe from the corresponding newsletter.